←Back to overview
Planning · Bardister
Planning applications near Bardister
7 applications in the last 12 months within 5 km. Data aggregated from the local planning authority by planit.org.uk.
Last 30 days
0
Last 12 months
7
Pending
0
Approved
7
PendingApprovedRefusedWithdrawnOtherCentre of Bardister
- ApprovedApplication for consent, agreement or approval required by planning Condition 8 (Structural supports) of planning application 2025/133/PPFThe Haa Tirvister Ollaberry Shetland ZE2 9RUReceived 28 Jun 2026Decided 28 Jun 2026Full2025/133/DCON11.06 km from centreShetlands council
- ApprovedApplication for consent, agreement or approval required by planning Condition 3 (Structural repairs) of planning application 2025/134/LBCThe Haa Tirvister Ollaberry Shetland ZE2 9RUReceived 28 Jun 2026Decided 28 Jun 2026Heritage2025/134/DCON11.06 km from centreShetlands council
- Approved with conditionsDemolish existing south gable elevation extension and erect a two-storey extension; install surface water soakaway and air source heat pumpKnowes Tirvister Ollaberry Shetland ZE2 9RUReceived 21 May 2026Decided 15 Jul 2026Full2026/102/PPF0.85 km from centreShetlands council
- ApprovedApplication for consent, agreement or approval required by planning Condition: 04 (Biodiversity) of planning application 2025/259/PPF.Lower Field Adjacent To Ollaberry Bay Ollaberry Shetland ZE2 9RTReceived 13 Jan 2026Decided 22 Jan 2026Conditions2025/259/DCON2.58 km from centreShetlands council
- ApprovedApplication for consent, agreement or approval required by planning Condition: 07 (Flood Risk Managment) of planning application 2025/259/PPF.Lower Field Adjacent To Ollaberry Bay Ollaberry Shetland ZE2 9RTReceived 13 Jan 2026Decided 22 Jan 2026Conditions2025/259/DCON12.58 km from centreShetlands council
- Approved with conditionsThe erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TUReceived 19 Dec 2025Decided 24 Aug 2026Full2025/317/PPF3.33 km from centreShetlands council
- Approved with conditionsInstallation of replacement sludge holding tank.Eela Water Treatment Works, Ollaberry, ShetlandReceived 16 Dec 2025Decided 19 Jan 2026Full2025/311/PPF2.39 km from centreShetlands council
Showing the 7 most recent of 7 within 5 km. Planning data from PlanIt, updated nightly. For older or narrowly defined applications, consult the council portal directly.