Planning · Coggeshall
Planning applications near Coggeshall
39 applications in the last 12 months within 5 km. Data aggregated from the local planning authority by planit.org.uk.
Last 30 days
0
Last 12 months
39
Pending
11
Approved
28
PendingApprovedRefusedWithdrawnOtherCentre of Coggeshall
- PendingCertification of lawful development for the placement of a static caravan within the curtilage of Rowan Lodge Kelvedon Road. No materialchange of use will be taking place.Rowan Lodge, Kelvedon Road, Inworth Colchester CO5 9SHReceived 11 Oct 2026Outline2618214.73 km from centreColchester council
- PendingContinuation of the Erection of a new single-storey building to provide classrooms, a studio and ancillary spaces, including PV Panels, together with an associated outdoor learning area, extended car park, new hard play areas, improved access from Public Footpath No. 61, secure cycle parking, refuse store, ASHPs, and ancillary development without compliance with Condition 6 (Construction Management Plan) attached to Planning Permission CC/BTE/25/26, to allow the removal of the site office and welfare facilities in connection with planning application CC/BTE/69/26St Peter's Church Of England Primary School, Myneer Park, Coggeshall, Essex, CO6 1YUReceived 05 Oct 2026ConditionsCC/BTE/74/260.64 km from centreEssex council
- ApprovedDetails pursuant to Condition 1 (Notification of Commencement) – CC/BTE/25/26: Erection of a new single-storey building to provide classrooms, a studio and ancillary spaces, including PV Panels, together with an associated outdoor learning area, extended car park, new hard play areas, improved access from Public Footpath No. 61, secure cycle parking, refuse store, ASHPs, and ancillary developmentSt Peter's Church Of England Primary School, Myneer Park, Coggeshall, Essex, CO6 1YUReceived 23 Sept 2026Decided 28 Sept 2026ConditionsCC/BTE/25/26/01/010.64 km from centreEssex council
- PendingDetails pursuant to Condition 3 (External Materials) – CC/BTE/25/26: Erection of a new single-storey building to provide classrooms, a studio and ancillary spaces, including PV Panels, together with an associated outdoor learning area, extended car park, new hard play areas, improved access from Public Footpath No. 61, secure cycle parking, refuse store, ASHPs, and ancillary developmentSt Peter's Church Of England Primary School, Myneer Park, Coggeshall, Essex, CO6 1YUReceived 13 Sept 2026ConditionsCC/BTE/25/26/03/010.64 km from centreEssex council
- ApprovedDetails pursuant to Condition 4 (Air Source Heat Pump enclosures) – CC/BTE/25/26: Erection of a new single-storey building to provide classrooms, a studio and ancillary spaces, including PV Panels, together with an associated outdoor learning area, extended car park, new hard play areas, improved access from Public Footpath No. 61, secure cycle parking, refuse store, ASHPs, and ancillary developmentSt Peter's Church Of England Primary School, Myneer Park, Coggeshall, Essex, CO6 1YUReceived 13 Sept 2026Decided 08 Oct 2026ConditionsCC/BTE/25/26/04/010.64 km from centreEssex council
- ApprovedDetails pursuant to Condition 5 (Cycle parking) – CC/BTE/25/26: Erection of a new single-storey building to provide classrooms, a studio and ancillary spaces, including PV Panels, together with an associated outdoor learning area, extended car park, new hard play areas, improved access from Public Footpath No. 61, secure cycle parking, refuse store, ASHPs, and ancillary developmentSt Peter's Church Of England Primary School, Myneer Park, Coggeshall, Essex, CO6 1YUReceived 13 Sept 2026Decided 18 Oct 2026ConditionsCC/BTE/25/26/05/010.64 km from centreEssex council
- ApprovedDetails pursuant to Condition 7 (Hard and soft landscaping) – CC/BTE/25/26: Erection of a new single-storey building to provide classrooms, a studio and ancillary spaces, including PV Panels, together with an associated outdoor learning area, extended car park, new hard play areas, improved access from Public Footpath No. 61, secure cycle parking, refuse store, ASHPs, and ancillary developmentSt Peter's Church Of England Primary School, Myneer Park, Coggeshall, Essex, CO6 1YUReceived 13 Sept 2026Decided 06 Nov 2026ConditionsCC/BTE/25/26/07/010.64 km from centreEssex council
- ApprovedDetails pursuant to Condition 12 (External lighting) – CC/BTE/25/26: Erection of a new single-storey building to provide classrooms, a studio and ancillary spaces, including PV Panels, together with an associated outdoor learning area, extended car park, new hard play areas, improved access from Public Footpath No. 61, secure cycle parking, refuse store, ASHPs, and ancillary developmentSt Peter's Church Of England Primary School, Myneer Park, Coggeshall, Essex, CO6 1YUReceived 13 Sept 2026Decided 21 Sept 2026ConditionsCC/BTE/25/26/12/010.64 km from centreEssex council
- PendingTemporary change of use for a period of 24 months of a dwellinghouse (Use Class C3) to a site office and welfare facility (Sui Generis) in connection with construction works at St Peter's Primary School, as approved under planning permission CC/BTE/25/26, and as applied for under planning application CC/BTE/74/2610 Myneer Park, Coggeshall, Essex, CO6 1YUReceived 02 Sept 2026FullCC/BTE/69/260.64 km from centreEssex council
- Approved with conditionsDetails pursuant to partial discharge of condition 41 (Noise monitoring August 2026) of planning permission ref. ESS/39/23/BTE. ESS/39/23/BTE is the extant planning permission for the Rivenhall Integrated Waste Management Facility.Land at Rivenhall Airfield, Coggeshall Road, Braintree, CO5 9DFReceived 19 Aug 2026Decided 16 Sept 2026ConditionsESS/39/23/BTE/41/053.19 km from centreEssex council
- PendingNew self build detached dwellingPlot 1, Godbolts Farm, Great Tey Road, Marks Tey Colchester CO6 1HZReceived 06 Aug 2026Full2614604.58 km from centreColchester council
- PendingNew self build detached dwellingPlot 2, Godbolts Farm, Great Tey Road, Marks Tey Colchester CO6 1HZReceived 06 Aug 2026Full2614624.58 km from centreColchester council
- Approved with conditionsDetails pursuant to condition 45 (Completion of archaeological field work – Phase 4 north and part of phase 5 ) of ESS/12/20/BTE. ESS/12/20/BTE was for “Extraction of 6.5 million tonnes of sand and gravel (from Site A7 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems. In addition, extension of the internal haul road into Site A7 and access for private and support vehicles to the Site A7 contractors' compound via Woodhouse Lane and Cuthedge Lane. Restoration of Site A7 to agriculture and biodiversity (species rich grassland and wetland).”Bradwell Quarry, Church Road, Bradwell, CM77 8EP, and land south of Cuthedge Lane.Received 04 Aug 2026Decided 16 Sept 2026ConditionsESS/12/20/BTE/45/034.1 km from centreEssex council
- ApprovedBiodiversity Gain Plan pursuant to permission ref: CC/BTE/25/26 (Erection of a new single-storey building to provide classrooms, a studio and ancillary spaces, including PV Panels, together with an associated outdoor learning area, extended car park, new hard play areas, improved access from Public Footpath No. 61, secure cycle parking, refuse store, ASHPs, and ancillary development)St Peter's Church Of England Primary School, Myneer Park, Coggeshall, Essex, CO6 1YUReceived 29 Jul 2026Decided 22 Sept 2026ConditionsCC/BTE/25/26/BGP10.64 km from centreEssex council
- Approved with conditionsDetails pursuant to Condition 14 (Habitat Management and Monitoring Plan) – CC/BTE/25/26: Erection of a new single-storey building to provide classrooms, a studio and ancillary spaces, including PV Panels, together with an associated outdoor learning area, extended car park, new hard play areas, improved access from Public Footpath No. 61, secure cycle parking, refuse store, ASHPs, and ancillary developmentSt Peter's Church Of England Primary School, Myneer Park, Coggeshall, Essex, CO6 1YUReceived 28 Jul 2026Decided 22 Sept 2026ConditionsCC/BTE/25/26/14/010.64 km from centreEssex council
- ApprovedDetails pursuant to legal obligation set out in Clause 3.10.3 (Traffic Routing Management Scheme) of Legal Agreement (dated 30 October 2009 as amended) 1 year review of Traffic Routing Management Scheme (ESS/39/23/BTE/LA1) associated with ESS/39/23/BTE. ESS/39/23/BTE is the extant permission (as at 28 July 2026) for the Rivenhall Integrated Waste Management Facility.Rivenhall Airfield, Coggeshall Road (A120), Braintree, CO5 9DFReceived 27 Jul 2026Decided 28 Jul 2026ESS/39/23/BTE/LA63.19 km from centreEssex council
- PendingDetails pursuant to condition 36 (Landscape Ecological Management Plan) of ESS/12/20/BTE. ESS/12/20/BTE was for “Extraction of 6.5 million tonnes of sand and gravel (from Site A7 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems. In addition, extension of the internal haul road into Site A7 and access for private and support vehicles to the Site A7 contractors' compound via Woodhouse Lane and Cuthedge Lane. Restoration of Site A7 to agriculture and biodiversity (species rich grassland and wetland).”Bradwell Quarry, Church Road, Bradwell, Essex, CM77 8EPReceived 20 Jul 2026ConditionsESS/12/20/BTE/36/014.1 km from centreEssex council
- PendingDetails pursuant to condition 53 (Aftercare Scheme for Woodland and Agriculture) of ESS/12/20/BTE. ESS/12/20/BTE was for “Extraction of 6.5 million tonnes of sand and gravel (from Site A7 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems. In addition, extension of the internal haul road into Site A7 and access for private and support vehicles to the Site A7 contractors' compound via Woodhouse Lane and Cuthedge Lane. Restoration of Site A7 to agriculture and biodiversity (species rich grassland and wetland).”Bradwell Quarry, Church Road, Bradwell, Essex, CM77 8EPReceived 20 Jul 2026ConditionsESS/12/20/BTE/53/024.1 km from centreEssex council
- PendingDetails pursuant to condition 62 (Aftercare scheme for biodiversity) of ESS/12/20/BTE. ESS/12/20/BTE was for “Extraction of 6.5 million tonnes of sand and gravel (from Site A7 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems. In addition, extension of the internal haul road into Site A7 and access for private and support vehicles to the Site A7 contractors' compound via Woodhouse Lane and Cuthedge Lane. Restoration of Site A7 to agriculture and biodiversity (species rich grassland and wetland).”Bradwell Quarry, Church Road, Bradwell, Essex, CM77 8EPReceived 20 Jul 2026ConditionsESS/12/20/BTE/62/014.1 km from centreEssex council
- Approved with conditionsDetails pursuant to condition 22 (Noise monitoring – April 2026) of planning permission ESS/12/20/BTE. ESS/12/20/BTE was for “Extraction of 6.5 million tonnes of sand and gravel (from Site A7 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems. In addition, extension of the internal haul road into Site A7 and access for private and support vehicles to the Site A7 contractors' compound via Woodhouse Lane and Cuthedge Lane. Restoration of Site A7 to agriculture and biodiversity (species rich grassland and wetland)Bradwell Quarry, Church Road, Bradwell, CM77 8EP, and land south of Cuthedge Lane.Received 16 Jul 2026Decided 05 Aug 2026ConditionsESS/12/20/BTE/22/084.1 km from centreEssex council
- ApprovedDetails pursuant to Schedule 8 para 1.4 (Provision of bat boxes) of Legal Agreement (dated 22 June 2022) associated with ECC Planning Ref. ESS/12/20/BTE. ESS/12/20/BTE permission for “Extraction of 6.5 million tonnes of sand and gravel (from Site A7 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems. In addition, extension of the internal haul road into Site A7 and access for private and support vehicles to the Site A7 contractors' compound via Woodhouse Lane and Cuthedge Lane.”Bradwell Quarry, Church Road, Bradwell, CM77 8EPReceived 09 Jul 2026Decided 09 Jul 2026ESS/12/20/BTE/LA14.1 km from centreEssex council
- ApprovedNon-material amendment conditions 2 and 62 of ESS/12/20/BTE to normalise the site wide restoration scheme across Site A7 to include the approved restoration details across other areas of Bradwell Quarry approved under ESS/79/20/BTE/NMA2.Bradwell Quarry, Church Road, Bradwell, Essex, CM77 8EPReceived 06 Jul 2026Decided 27 Jul 2026AmendmentESS/12/20/BTE/NMA64.1 km from centreEssex council
- Approved with conditionsErection of Dutch Barn - partial open sided to cover muck storage.Teybrook Farm, Brook Road, Great Tey Colchester CO6 1JEReceived 15 Jun 2026Decided 17 Aug 2026Full2611094.83 km from centreColchester council
- Approved with conditionsInstallation of one Hypervolt Home 3 Pro EV charger mounted on a free-standing post within the existing gravel parking area; and installation of associated low-level external cabling enclosed in conduit fixed along the base/plinth zone of the externalThe Old Rectory, Great Tey Road Little TeyReceived 27 May 2026Decided 23 Jul 2026Full2609914.57 km from centreColchester council
- Approved with conditionsDetails pursuant to partial discharge of condition 41 (Noise monitoring May 2026) of planning permission ref. ESS/39/23/BTE. ESS/39/23/BTE is the extant planning permission for the Rivenhall Integrated Waste Management Facility.Land at Rivenhall Airfield, Coggeshall Road, Braintree, CO5 9DFReceived 20 May 2026Decided 09 Jun 2026ConditionsESS/39/23/BTE/41/043.19 km from centreEssex council
- PendingDetails pursuant to condition 54 (Biodiversity Monitoring Plan - Annual Monitoring Report for 2025) of planning permission ESS/39/23/BTE. ESS/39/23/BTE is a variation of the planning permission for the Rivenhall Integrated Waste Management Facility.Land at Rivenhall Airfield, Coggeshall Road, Braintree, CO5 9DFReceived 18 May 2026ConditionsESS/39/23/BTE/54/023.19 km from centreEssex council
- Approved with conditionsRetrospective planning application for the retention of lean-to-cover to Stonefield's Farm Shop.Stonefields Farm, Kelvedon Road, Inworth Colchester CO5 9SHReceived 20 Apr 2026Decided 15 Jun 2026Full2607194.73 km from centreColchester council
- Approved with conditionsinstallation of one Hypervolt Home 3 Pro EV charger mounted on a free-standing post within the existing gravel parking area; and installation of associated low-level external cabling enclosed in conduit fixed along the base/plinth zone of the externalThe Old Rectory, Great Tey Road, Little Tey Colchester CO6 1JAReceived 12 Apr 2026Decided 23 Jul 2026Heritage2606664.57 km from centreColchester council
- ApprovedErection of a new single-storey building to provide classrooms, a studio and ancillary spaces, including PV Panels, together with an associated outdoor learning area, extended car park, new hard play areas, improved access from Public Footpath No. 61, secure cycle parking, refuse store, ASHPs, and ancillary development.St Peter's Church Of England Primary School, Myneer Park, Coggeshall, Essex, CO6 1YUReceived 09 Apr 2026Decided 23 Jul 2026FullCC/BTE/25/260.64 km from centreEssex council
- Approved with conditionsDetails pursuant to condition 17 (Agricultural aftercare for 2025 to 2026) of ESS/106/22/BTE. ESS/106/22/BTE was a variation of original permission ESS/03/18/BTE for MLP site A5 and also incorporates restoration for part of site R, Site A2 and Sites A3 and A4.Bradwell Quarry, Church Road, Bradwell, CM77 8EPReceived 09 Apr 2026Decided 17 May 2026ConditionsESS/106/22/BTE/17/024.1 km from centreEssex council
- Approved with conditionsDetails pursuant to condition 53 (Agricultural aftercare for 2025 to 2026 for Phase 1) of ESS/106/22/BTE. ESS/12/20/BTE is the extant permission for sand and gravel extraction in MLP site A7.Bradwell Quarry, Church Road, Bradwell, CM77 8EPReceived 09 Apr 2026Decided 17 May 2026ConditionsESS/12/20/BTE/53/014.1 km from centreEssex council
- PendingTwo new proposed 4 bed houses placed within the existing street scene along Great Tey Road together with the construction of a new footpath linking up to the existing footpathApex Lodge, Great Tey Road, Little Tey Colchester CO6 1HZReceived 20 Mar 2026Full2605164.58 km from centreColchester council
- Approved with conditionsDetails pursuant to partial discharge of condition 41 (Noise monitoring February 2026) of planning permission ref. ESS/39/23/BTE. ESS/39/23/BTE is the extant planning permission for the Rivenhall Integrated Waste Management FacilityLand at Rivenhall Airfield, Coggeshall Road, Braintree, CO5 9DFReceived 27 Feb 2026Decided 19 Apr 2026ConditionsESS/39/23/BTE/41/033.19 km from centreEssex council
- ApprovedNon-Material Amendment to the wording of Condition 46 of planning permission ESS/12/20/BTE to allow a longer period for preparation and submission of the Post-Excavation Assessment and Updated Project Design.Bradwell Quarry, Church Road, Bradwell, Essex, CM77 8EPReceived 20 Feb 2026Decided 04 May 2026AmendmentESS/12/20/BTE/NMA54.1 km from centreEssex council
- ApprovedNon-Material Amendment to the Description of Development of planning permission ESS/39/23/BTE to remove reference to materials processed within the IWMF, together with the re-wording of Condition 29 to include reference to materials processed within the IWMF. ESS/39/23/BTE is an amended planning permission for the Rivenhall Integrated Waste Management Facility (IWMF)Rivenhall IWMF Coggeshall Road Braintree CO5 9DFReceived 30 Jan 2026Decided 11 Mar 2026AmendmentESS/39/23/BTE/NMA203.19 km from centreEssex council
- Approved with conditionsProposed formation of new unit 10 adjoined to unit 9 (previous permission 221761)Tey Craft Centre, Brook Road, Great Tey Colchester CO6 1JEReceived 18 Dec 2025Decided 03 Mar 2026Full2527274.83 km from centreColchester council
- ApprovedDetails pursuant to 6 month review of Traffic Routing Management Scheme (ESS/39/23/BTE/LA1) associated with ESS/39/23/BTE the extant permission for the Rivenhall Integrated Waste Management Facility as at December 2025.Rivenhall Airfield, Coggeshall Road (A120), Braintree, CO5 9DFReceived 15 Dec 2025Decided 23 Jan 2026ESS/39/23/BTE/LA53.19 km from centreEssex council
- Approved with conditionsInstall an Electric Vehicle charger to property. Will be discretely fixed to an external wall and not viewable from the front.Honeypot Cottage, 184 Coggeshall Road, Marks Tey Colchester CO6 1HSReceived 12 Dec 2025Decided 26 Feb 2026Full2527004.46 km from centreColchester council
- Approved with conditionsDetails pursuant to partial discharge of condition 41 (Noise monitoring November 2025). ESS/39/23/BTE is the extant planning permission for the Rivenhall Integrated Waste Management FacilityLand at Rivenhall Airfield, Coggeshall Road, Braintree, CO5 9DFReceived 27 Nov 2025Decided 05 Jan 2026ConditionsESS/39/23/BTE/41/023.19 km from centreEssex council
Showing the 39 most recent of 39 within 5 km. Planning data from PlanIt, updated nightly. For older or narrowly defined applications, consult the council portal directly.