←Back to overview
Planning · Hothorpe
Planning applications near Hothorpe
125 applications in the last 12 months within 5 km. Data aggregated from the local planning authority by planit.org.uk.
Last 30 days
4
Last 12 months
125
Pending
36
Approved
85
PendingApprovedRefusedWithdrawnOtherCentre of Hothorpe
- PendingDischarge of Condition 4 [Parking Surface Sample] of Planning Permission 2024/2420/LBC [Listed Building Consent for resurfacing of parking area and erection of a garden shed at Home Farm House Back Lane East Farndon LE16 9SE]Home Farm House Back Lane East Farndon LE16 9SEReceived 11 Oct 2026Conditions2026/4241/COND4.63 km from centreWest Northamptonshire council
- PendingWorks to tree (HDC TPO 197) (Horse Chestnut)19 Fernie Court Husbands Bosworth Leicestershire LE17 6LWReceived 08 Oct 2026Trees26/01461/TPO2.95 km from centreHarborough council
- PendingNotification to determine if Prior Approval is required for the proposed change of use for part of an agricultural building to one larger dwellinghouses (C3) (Class Qa)Woodside Bungalow Theddingworth Road Husbands Bosworth Leicestershire LE17 6NLReceived 06 Oct 2026Outline26/01449/PDN1.32 km from centreHarborough council
- PendingErection of a replacement front conservatory43 Berridges Lane Husbands Bosworth Leicestershire LE17 6LEReceived 01 Oct 2026Full26/01456/FUL3.06 km from centreHarborough council
- PendingWorks to trees5 Kilworth Road Husbands Bosworth Leicestershire LE17 6JYReceived 23 Sept 2026Trees26/01385/TCA3.09 km from centreHarborough council
- ApprovedDead, dying diseased trees14 Mowsley Road Husbands Bosworth Leicestershire LE17 6LRReceived 22 Sept 2026Decided 15 Oct 2026Trees26/01401/DDD2.8 km from centreHarborough council
- PendingWorks to treesManor Farm House 15 Main Street Theddingworth Leicestershire LE17 6QZReceived 15 Sept 2026Trees26/01332/TCA0.62 km from centreHarborough council
- ApprovedWorks to trees (fell)24 Tower Court Lubenham Leicestershire LE16 9SYReceived 13 Sept 2026Decided 20 Oct 2026Trees26/01327/TCA4.14 km from centreHarborough council
- PendingInstallation of 13 solar panels (3 on stable building, 6 on annexe and 4 on flat roof of main dwelling)2 The Green Husbands Bosworth Leicestershire LE17 6JTReceived 10 Sept 2026Heritage26/01323/LBC2.98 km from centreHarborough council
- PendingInstallation of an additional pole within overhead line to create H pole set up to allow installation of a pole-mounted transformerLand Off Long Close Lane Laughton LeicestershireReceived 10 Sept 2026Other26/01365/OHL3.37 km from centreHarborough council
- PendingErection of replacement stables, tack room and store, and creation of new associated accessNew Farm Theddingworth Road Mowsley Leicestershire LE17 6PZReceived 31 Aug 2026Full26/01253/FUL3.83 km from centreHarborough council
- PendingConversion of the existing redundant Red Brick Barn at Manor Farm to a three-bedroom dwelling, including associated worksManor House Farm Main Street Gumley Leicestershire LE16 7RUReceived 27 Aug 2026Full26/01243/FUL4.99 km from centreHarborough council
- PendingDemolition of the existing Barn A at Manor Farm and erection of a two storey three-bedroom dwellingManor House Farm Main Street Gumley Leicestershire LE16 7RUReceived 27 Aug 2026Full26/01244/FUL4.97 km from centreHarborough council
- PendingSubdivision of the existing Manor Farm House into a retained four-bedroom dwelling and a new two-bedroom cottage, including single storey side and rear extensionsManor House Farm Main Street Gumley Leicestershire LE16 7RUReceived 27 Aug 2026Full26/01245/FUL4.99 km from centreHarborough council
- ApprovedWorks to trees15 Mowsley Road Husbands Bosworth Leicestershire LE17 6LRReceived 23 Aug 2026Decided 11 Oct 2026Trees26/01204/TCA2.87 km from centreHarborough council
- ApprovedThe Electronic Communications Code (Conditions and restrictions) Regulations 2003 (as amended) - Regulation 5 Notice of Intention to Install Fixed Line Broadband Apparatus - (one 12m light pole) - Permitted Development - For information purposes only. This is not an application to which comments can be made.The White House 38 Main Street Lubenham Leicestershire LE16 9TFReceived 19 Aug 2026Decided 20 Oct 2026Outline26/01197/PDN4.2 km from centreHarborough council
- PendingConversion of brick agricultural building to a 3 bedroom holiday accommodationPrince Rupert Farm Naseby Road Sibbertoft LE16 9UHReceived 16 Aug 2026Full2026/3608/FULL4.07 km from centreWest Northamptonshire council
- PendingErection of an agricultural livestock and storage buildingLand OS 9354 Hothorpe Road Theddingworth LeicestershireReceived 12 Aug 2026Full26/01165/FUL0.47 km from centreHarborough council
- PendingDemolition of existing dwelling and stables and erection of a replacement dwellingNew Farm Theddingworth Road Mowsley Leicestershire LE17 6PZReceived 11 Aug 2026Full26/01161/FUL3.9 km from centreHarborough council
- ApprovedWorks to trees (Fell)1 Tower Court Lubenham Leicestershire LE16 9SYReceived 04 Aug 2026Decided 16 Sept 2026Trees26/01131/TCA4.02 km from centreHarborough council
- PendingDischarge of Conditions 3 (CEMP), 4 (Historic Building Record), 5 (Risk Based Land Contamination Assessment) and 9 (Landscaping) of 24/00397/FULChapel Farm Foxton Road Lubenham Leicestershire LE16 7RYReceived 03 Aug 2026Conditions26/01119/PCD4.5 km from centreHarborough council
- ApprovedWorks to tree (HDC TPO 174)7 Wells Close Husbands Bosworth Leicestershire LE17 6NAReceived 26 Jul 2026Decided 24 Sept 2026Trees26/01078/TPO3 km from centreHarborough council
- ApprovedSingle storey extension to rear of dwelling4 Lammas Close Husbands Bosworth Leicestershire LE17 6LLReceived 26 Jul 2026Decided 24 Sept 2026Full26/01080/FUL2.83 km from centreHarborough council
- ApprovedWorks to trees (Fell)The Barn 22 Honeypot Lane Husbands Bosworth Leicestershire LE17 6LYReceived 22 Jul 2026Decided 16 Sept 2026Trees26/01066/TCA2.65 km from centreHarborough council
- ReferredErection of two storey special education needs and disability school building (LCC reference 2026/Reg3Ma/0071/LCC)Land At Kilworth Road Husbands Bosworth LeicestershireReceived 20 Jul 2026Decided 10 Sept 2026Other26/01086/LCC3.49 km from centreHarborough council
- PendingDischarge of Conditions 4 (CEMP) and 12 (Highways) of 24/01646/FULLand Off The Green Lubenham LeicestershireReceived 13 Jul 2026Conditions26/01025/PCD4.26 km from centreHarborough council
- ApprovedWorks trees (T1 and T3 only)Ash Tree House Old Hall Lane Lubenham Leicestershire LE16 9TJReceived 13 Jul 2026Decided 15 Jul 2026Trees26/01026/TCA4.18 km from centreHarborough council
- ApprovedThe erection of a two storey Special Education Needs and Disability (SEND) School building and supporting infrastructure which includes a new access and footpath arrangements, car parking area, cycle stores, surface water drainage (attenuation basin/ swales/ pipework), landscaping, external play space, sports facilities (Football pitch, Multi Use Games Area (MUGA)), substation, CCTV equipment, M & E plant equipment, Sprinkler Tank, and renewable energy installationsKilworth Road, Husbands Bosworth, Harborough, Leicestershire, LE17 6JWReceived 06 Jul 2026Decided 19 Oct 2026Other2026/Reg3Ma/0071/LCC3.61 km from centreLeicestershire council
- ApprovedTwo storey extensions to the side and rear, single storey extension to the front, and single storey rear extension and roof changes to existing garageThe Tribitts Main Street Mowsley Leicestershire LE17 6NUReceived 05 Jul 2026Decided 03 Sept 2026Full26/00979/FUL4.53 km from centreHarborough council
- ApprovedExtension to an existing field shelterManor Farm House 15 Main Street Theddingworth Leicestershire LE17 6QZReceived 01 Jul 2026Decided 08 Sept 2026Full26/00963/FUL0.35 km from centreHarborough council
- ApprovedWorks to treesVillage Hall Laughton Road Lubenham Leicestershire LE16 9TEReceived 28 Jun 2026Decided 06 Aug 2026Trees26/00940/TCA3.91 km from centreHarborough council
- ApprovedT2- One Ash tree to remove one large overweight limb back to a suitable growth point. (other trees on form are not TPO)Ashtree House Old Hall Lane Lubenham Market Harborough LE16 9TJReceived 28 Jun 2026Decided 02 Aug 2026Trees2026/TPO/0067/LCC4.2 km from centreLeicestershire council
- PendingDischarge of Conditions 4 (Risk Based Land Contamination Assessment), 9 (Barn Owl Method Statement) and 10 (Biodiversity Enhancement Layout) of 26/00092/FULHill House Welford NORTHAMPTON Northamptonshire NN6 6JQReceived 21 Jun 2026Conditions26/00894/PCD4.82 km from centreHarborough council
- PendingDischarge of Condition 5 (GCN Mitigation) and 6 (CEMP Biodiversity) of 24/01646/FULLand Off The Green Lubenham LeicestershireReceived 17 Jun 2026Conditions26/00868/PCD4.26 km from centreHarborough council
- ApprovedWorks to treesThe Homestead Main Street Theddingworth Leicestershire LE17 6QRReceived 17 Jun 2026Decided 27 Jul 2026Trees26/00871/TCA0.6 km from centreHarborough council
- ApprovedDischarge of Biodiversity Gain Plan of 26/00133/FULLand At Oak Lodge Farm Welford Road Husbands Bosworth LeicestershireReceived 11 Jun 2026Decided 09 Aug 2026Conditions26/00846/BGP3.5 km from centreHarborough council
- ApprovedWorks to tree (fell)37 School Lane Lubenham Leicestershire LE16 9TWReceived 08 Jun 2026Decided 16 Jul 2026Trees26/00823/TCA4.11 km from centreHarborough council
- ApprovedWorks to trees (LCC TPO)Ash Tree House Old Hall Lane Lubenham Leicestershire LE16 9TJReceived 08 Jun 2026Decided 03 Aug 2026Trees26/00827/TPO4.18 km from centreHarborough council
- ApprovedWorks to trees2 Tower Court Lubenham Leicestershire LE16 9SYReceived 31 May 2026Decided 08 Jul 2026Trees26/00784/TCA4.01 km from centreHarborough council
- ApprovedWorks to tree Lime (T1): Re-pollard to previous reduction points (2 to 2.5 metres) (HDC TPO 197)17 Fernie Court Husbands Bosworth Leicestershire LE17 6LWReceived 26 May 2026Decided 21 Jul 2026Trees26/00758/TPO2.94 km from centreHarborough council
- ApprovedTwo storey side extension5 Bell Lane Husbands Bosworth Leicestershire LE17 6LAReceived 24 May 2026Decided 22 Jul 2026Full26/00744/FUL3.08 km from centreHarborough council
- PendingPartial demolition of existing single storey extension and covered store/outbuilding, conversion of existing attached outbuildings, erection of an infill extension to rear courtyardSouth View Bosworth Road Theddingworth Leicestershire LE17 6QWReceived 19 May 2026Full26/00710/FUL0.57 km from centreHarborough council
- ApprovedChange of use of existing building to mixed use of existing B8 (storage and distribution) and B2 (general industrial) use, and associated equipment/plant, and associated improvements to the existing vehicular accessDene Lodge Theddingworth Road Husbands Bosworth Leicestershire LE17 6NLReceived 18 May 2026Decided 11 Aug 2026Full26/00704/FUL1.17 km from centreHarborough council
- PendingErection of a timber framed and clad garden storeThe Granary High Street Husbands Bosworth Leicestershire LE17 6LJReceived 17 May 2026Full26/00693/FUL2.85 km from centreHarborough council
- PendingDead dying diseased treesLand West Of Theddingworth Road Husbands Bosworth LeicestershireReceived 17 May 2026Trees26/00696/DDD2.52 km from centreHarborough council
- ApprovedDischarge of Condition 3 (Materials) of 26/00092/FULHill House Welford NORTHAMPTON Northamptonshire NN6 6JQReceived 17 May 2026Decided 01 Jun 2026Conditions26/00701/PCD4.98 km from centreHarborough council
- ApprovedNon material amendment to change wall finish from Ironstone/Limestone mix to just Limestone to planning permission 2025/5313/FULL (Proposed two storey side extension, single storey side extension, single storey rear extension & external alterations)Townsend Lodge 3 Welford Road Sibbertoft LE16 9UJReceived 17 May 2026Decided 17 Jun 2026Amendment2026/2068/NMA2.89 km from centreWest Northamptonshire council
- ApprovedRe-tile roof with like-for-like concrete tiles (retrospective)Lark Rise Main Street Mowsley Leicestershire LE17 6NTReceived 12 May 2026Decided 08 Jul 2026Heritage26/00669/LBC4.47 km from centreHarborough council
- ApprovedReplacement of concrete roof tiles with like-for-like concrete tiles and replacement of damaged solar panel (retrospective)4 Main Street Mowsley Leicestershire LE17 6NTReceived 12 May 2026Decided 08 Jul 2026Heritage26/00672/LBC4.48 km from centreHarborough council
- PendingT1: Eucalyptus Tree - Remove to ground level. Tree is non-native and has outgrown the space in the garden.The Old Bakehouse Main Street East Farndon LE16 9SJReceived 12 May 2026Trees2026/2020/TCA4.62 km from centreWest Northamptonshire council
- ApprovedDetermination as to whether prior approval is required (under Schedule 2, Part 6, Class A of the above Order) for excavation works to the riverbank and water retention featuresLand east of Welford village and south of Sulby Lodge Farm, NN6 6HZReceived 07 May 2026Decided 15 Jul 2026Outline2026/1920/PND4.89 km from centreWest Northamptonshire council
- ApprovedPartial demolition of existing rear extension and erection of new, part single and part two storey rear extension.The Cedars Main Street East Farndon LE16 9SHReceived 30 Apr 2026Decided 08 Jul 2026Full2026/2032/FULL4.83 km from centreWest Northamptonshire council
- ApprovedChange of use of agricultural paddock to Equestrian Use for new menage/arena with concrete yard, muck pit and enclosure fencingNobold Hill Clipston Road Sibbertoft LE16 9UBReceived 28 Apr 2026Decided 15 Oct 2026Full2026/2001/FULL3.6 km from centreWest Northamptonshire council
- PendingConversion of Garage/workshop to create new 1 bedroom dwelling with 2 parking spacesFarndon Grange, Marston Lane, East Farndon LE16 9SLReceived 27 Apr 2026Full2026/1983/FULL4.21 km from centreWest Northamptonshire council
- ApprovedWorks to trees (LCC TPO 46)Sewage Treatment Works Main Street Gumley Leicestershire LE16 7RUReceived 22 Apr 2026Decided 04 May 2026Trees26/00569/TPO4.99 km from centreHarborough council
- ApprovedApplication to determine if Prior Approval is required for a proposed change of use from commercial, business and services (Use Class E) to four dwellinghouses (Use Class C3) (Part 3 Class MA)Offices Old Barn Farm Welford Road Husbands Bosworth Leicestershire LE17 6JLReceived 16 Apr 2026Decided 10 Jun 2026Outline26/00542/PDN3.96 km from centreHarborough council
- ApprovedDischarge of Condition 7 (Bat and Bird Survey) of 24/01596/FULOstlers Stables 36 Bell Lane Husbands Bosworth Leicestershire LE17 6LAReceived 16 Apr 2026Decided 03 Jun 2026Conditions26/00570/PCD3.04 km from centreHarborough council
- ApprovedNotification to determine if Prior Approval is required for the proposed change of use of part of an agricultural building to a dwellinghouse (C3) and for associated operational development (Class Qa and Qc)Woodside Farm Theddingworth Road Husbands Bosworth Leicestershire LE17 6NLReceived 15 Apr 2026Decided 25 Jun 2026Outline26/00534/PDN1.36 km from centreHarborough council
- ApprovedInstallation of solar panels to front and side roof elevationsSt Marys Main Street Gumley Leicestershire LE16 7RUReceived 12 Apr 2026Decided 02 Jul 2026Full26/00517/FUL4.99 km from centreHarborough council
- PendingOutline application for the demolition of existing dwellinghouse and erection of replacement dwellinghouse (self build/custom build) (access only to be considered)Mowsley Lodge Theddingworth Road Mowsley Leicestershire LE17 6PZReceived 12 Apr 2026Outline26/00519/OUT3.82 km from centreHarborough council
- ApprovedWorks to tree (HDC TPO 197)18 Fernie Court Husbands Bosworth Leicestershire LE17 6LWReceived 07 Apr 2026Decided 20 May 2026Trees26/00497/TPO2.95 km from centreHarborough council
- ApprovedWorks to treePipers Piece Main Street Lubenham Leicestershire LE16 9TFReceived 06 Apr 2026Decided 14 May 2026Trees26/00493/TCA4.29 km from centreHarborough council
- ApprovedDemolition of existing mono-pitched roof and a side wall of the existing garage, and provision of a new pitched roof, a new false ceiling, and a new wall. The resurfacing of the yard, and the replacement of the entrance gate33 Rushes Lane Lubenham Leicestershire LE16 9TNReceived 05 Apr 2026Decided 28 May 2026Full26/00489/FUL3.99 km from centreHarborough council
- ApprovedWorks to treesSt Lukes Church Laughton Leicestershire LE17 6QDReceived 02 Apr 2026Decided 20 May 2026Trees26/00487/TCA4.14 km from centreHarborough council
- ApprovedReplacement of fifteen non-original windowsThe Old Vicarage 23 The Green Lubenham Leicestershire LE16 9TDReceived 02 Apr 2026Decided 16 Aug 2026Heritage26/00488/LBC4.18 km from centreHarborough council
- ApprovedLoft conversion, new rooflights and dormer windows plus internal alteration at first floorLowe Farm Nobold Hill Clipston Road Sibbertoft LE16 9UBReceived 30 Mar 2026Decided 15 Oct 2026Full2026/1661/FULL3.6 km from centreWest Northamptonshire council
- PendingOutline planning application for the construction of up to 150 dwellings with associated landscaping, open space, drainage infrastructure and associated works (all matters reserved except access from Welford Road)Land East Of Townend Close Husbands Bosworth LeicestershireReceived 29 Mar 2026Outline26/00470/OUT2.95 km from centreHarborough council
- ApprovedWorks to trees (Fell)28 Main Street Lubenham Leicestershire LE16 9TFReceived 23 Mar 2026Decided 28 Apr 2026Trees26/00418/TCA4.22 km from centreHarborough council
- PendingErection of 2 storey side and rear extensions and single storey rear extension (revised scheme of 15/02023/FUL) (part retrospective) (Variation of Condition 2 (Approved Plans) of 20/01819/FUL, to allow for changes to the elevational treatment, materials and fenestration) (Variation of Condition 1 (Approved Plans) 25/01133/VAC to allow for alterations to the roof and fenestration)Woodside Farm Theddingworth Road Husbands Bosworth Leicestershire LE17 6NLReceived 11 Mar 2026Conditions26/00367/VAC1.31 km from centreHarborough council
- ApprovedWorks to trees (fell)Red Roofs 39 Berridges Lane Husbands Bosworth Leicestershire LE17 6LEReceived 10 Mar 2026Decided 16 Apr 2026Trees26/00420/TCA3 km from centreHarborough council
- PendingChange of use of building for keeping of horses and construction of wooden stable and outdoor manège (retrospective)Pine Tree Farm Laughton Road Lubenham Leicestershire LE16 9TEReceived 04 Mar 2026Full26/00317/FUL3.57 km from centreHarborough council
- ApprovedWorks to tree11 Mowsley Road Husbands Bosworth Leicestershire LE17 6LRReceived 02 Mar 2026Decided 06 Apr 2026Trees26/00304/TCA2.86 km from centreHarborough council
- ApprovedT1 Oak - crown reduce by 7-8mLand OS 8163 Hothorpe Rd Theddingworth LE17 6QZReceived 02 Mar 2026Decided 14 Apr 2026Trees2026/TPO/0015/LCC0.66 km from centreLeicestershire council
- RefusedPermission in Principle for the erection of a minimum of 1 and maximum of 6 Self Build and/or Custom Build DwellingsLand At Dag Lane Mowsley LeicestershireReceived 26 Feb 2026Decided 22 Apr 2026Outline26/00360/PIP4.5 km from centreHarborough council
- ApprovedReplace or refurbish the existing window frames around the property with "Like for Like" hardwood timber profiles, except for allowances being made to accommodate double glazed sealed unitsHusbands Bosworth C Of E Primary School School Lane Husbands Bosworth Leicestershire LE17 6JUReceived 25 Feb 2026Decided 13 May 2026Heritage26/00282/LBC3.01 km from centreHarborough council
- ApprovedApproved wall material changed to be standing seam zinc on the side wall, 2 roof lights omitted and 1 large rooflight added in their place, revised boundary fence (proposed non-material amendment to 25/00769/FUL)5 Little Plough Lubenham Leicestershire LE16 9UYReceived 24 Feb 2026Decided 25 Mar 2026Amendment26/00281/NMA3.81 km from centreHarborough council
- PendingOutline application for the erection of 10 residential holiday lodges with associated parking and landscaping (layout only to be considered, all other matters reserved)Land Part OS 0800 Foxton Road Lubenham LeicestershireReceived 23 Feb 2026Outline26/00274/OUT4.16 km from centreHarborough council
- ApprovedWorks to tree20 Main Street Lubenham Leicestershire LE16 9TFReceived 20 Feb 2026Decided 26 Mar 2026Trees26/00266/TCA4.24 km from centreHarborough council
- PendingCertificate of lawfulness application for single dwelling that has been used for more than 10 yearsFarndon Grange, Marston Lane, East Farndon LE16 9SLReceived 17 Feb 2026Amendment2026/0820/LDE4.21 km from centreWest Northamptonshire council
- ApprovedWorks to trees Holm Oak (HDC TPO 197)17 Fernie Court Husbands Bosworth Leicestershire LE17 6LWReceived 16 Feb 2026Decided 21 Jul 2026Trees26/00237/TPO2.94 km from centreHarborough council
- ApprovedWorks to tree (LCC TPO 53) (T1- Oak tree with signs of decay in lower stem, canopy reduction 7-8m to alleviate stress and sail area of tree)The Byre Main Street Theddingworth Leicestershire LE17 6QZReceived 11 Feb 2026Decided 14 Apr 2026Trees26/00210/TPO0.57 km from centreHarborough council
- PendingDischarge of Condition 3 (Archaeology Written Scheme of Investigation) of 24/01646/FULLand Off The Green Lubenham LeicestershireReceived 06 Feb 2026Conditions26/00262/PCD4.26 km from centreHarborough council
- ApprovedWorks to trees14 Mowsley Road Husbands Bosworth Leicestershire LE17 6LRReceived 04 Feb 2026Decided 26 Mar 2026Trees26/00170/TCA2.8 km from centreHarborough council
- ApprovedWorks to trees (Fell)57 High Street Husbands Bosworth Leicestershire LE17 6LJReceived 04 Feb 2026Decided 17 Mar 2026Trees26/00171/TCA2.78 km from centreHarborough council
- ApprovedWidening of existing access for Anglian Water pumping station (pumping station approved as part of reserved matters planning permission 24/00200/REM)Land Adj HM Prison Welland Avenue Gartree Lubenham LeicestershireReceived 30 Jan 2026Decided 25 Aug 2026Full26/00139/FUL4.87 km from centreHarborough council
- ApprovedChange of use of agricultural building and associated land to storage (B8 use class)Land North East Of Foxton Road Lubenham LeicestershireReceived 29 Jan 2026Decided 11 Jun 2026Full26/00130/FUL3.98 km from centreHarborough council
- ApprovedErection of agricultural building and installation of concrete apron in frontLand At Oak Lodge Farm Welford Road Husbands Bosworth LeicestershireReceived 29 Jan 2026Decided 20 May 2026Full26/00133/FUL3.5 km from centreHarborough council
- ApprovedWorks to treesThe Lodge Main Street Theddingworth Leicestershire LE17 6QRReceived 28 Jan 2026Decided 04 Mar 2026Trees26/00126/TCA0.6 km from centreHarborough council
- ApprovedWorks to tree (fell)3 Church Street Husbands Bosworth Leicestershire LE17 6LTReceived 26 Jan 2026Decided 04 Mar 2026Trees26/00113/TCA2.78 km from centreHarborough council
- ApprovedDischarge of Conditions 2 (Roof Materials) and 3 (Bat and Bird Bricks/Boxes) of 25/01248/FULLavender Lakes Leicester Road Husbands Bosworth Leicestershire LE17 6NWReceived 23 Jan 2026Decided 26 Feb 2026Conditions26/00098/PCD3.52 km from centreHarborough council
- PendingReplacement of existing concrete farm yardSouthfields Farm Leicester Road Husbands Bosworth Leicestershire LE17 6NWReceived 23 Jan 2026Full26/00100/FUL3.74 km from centreHarborough council
- ApprovedCertificate of Lawfulness of Proposed Development for the like-for-like replacement of 6no. windows to the front elevationOak Green Cottage Laughton Leicestershire LE17 6QEReceived 23 Jan 2026Decided 14 Jul 2026Outline26/00106/CLU4.01 km from centreHarborough council
- ApprovedInstallation of full fibre broadband to the front elevation10 Church Walk Lubenham Leicestershire LE16 9TAReceived 22 Jan 2026Decided 17 Mar 2026Heritage26/00093/LBC3.99 km from centreHarborough council
- ApprovedCertificate of Lawfulness of Proposed Development for the removal of existing rear lean-to structure and erection of a single storey rear extensionPines Cottage Main Street Gumley Leicestershire LE16 7RUReceived 21 Jan 2026Decided 10 Mar 2026Outline26/00091/CLU4.99 km from centreHarborough council
- ApprovedDemolition of farmhouse, brick barn and outbuildings and erection of a replacement self-build dwelling and garageHill House Welford NORTHAMPTON Northamptonshire NN6 6JQReceived 21 Jan 2026Decided 30 Apr 2026Full26/00092/FUL4.82 km from centreHarborough council
- ApprovedWorks to trees (Fell)Corner House Laughton Leicestershire LE17 6QEReceived 19 Jan 2026Decided 20 Feb 2026Trees26/00079/TCA4 km from centreHarborough council
- PendingDischarge of Conditions 4 [External Joinery] and 20 [BNG] on Planning Permission 2024/2809/FULL [Proposed single storey, 20 bedroom nursing home, associated ancillary accommodation and parking provisions at Sibbertoft Manor Nursing Home, 3 Church Street, Sibbertoft, LE16 9UA.]Sibbertoft Manor Nursing Home 3 Church Street Sibbertoft LE16 9UAReceived 19 Jan 2026Conditions2026/0340/COND2.78 km from centreWest Northamptonshire council
- ApprovedWorks to treesThe Gables 54 Bell Lane Husbands Bosworth Leicestershire LE17 6LAReceived 14 Jan 2026Decided 20 Feb 2026Trees26/00055/TCA3.06 km from centreHarborough council
- PendingVariation of Conditions 3 (approved plans), 18 (surface water drainage) and 20 (foul water drainage) of 24/01144/VAC (Outline planning application (All Matters Reserved except for means of access and scale) for the construction of a new Category B prison of up to 82,555sqm within a secure perimeter fence, together with access, parking, landscaping and associated engineering works) to facilitate changes to the approved surface and foul water drainage strategyLand Adj HM Prison Welland Avenue Gartree Lubenham LeicestershireReceived 13 Jan 2026Conditions26/00040/VAC4.88 km from centreHarborough council
- ApprovedDischarge of Conditions 1 (Risk Based Land Contamination Assessment) and 4 (Boundary Treatment) of 25/01293/PDNLodge Farm Walton Lane Husbands Bosworth Leicestershire LE17 6NNReceived 13 Jan 2026Decided 11 Mar 2026Conditions26/00044/PCD3.98 km from centreHarborough council
Showing the 100 most recent of 125 within 5 km. Planning data from PlanIt, updated nightly. For older or narrowly defined applications, consult the council portal directly.