←Back to overview
Planning · Mybster
Planning applications near Mybster
5 applications in the last 12 months within 5 km. Data aggregated from the local planning authority by planit.org.uk.
Last 30 days
0
Last 12 months
5
Pending
0
Approved
3
PendingApprovedRefusedWithdrawnOtherCentre of Mybster
- ApprovedPrior Notification for a Forestry-related road. (Class 22)Moss Of Toftingal Nr Spittal CaithnessReceived 16 Jul 2026Decided 06 Aug 2026Outline26/03082/PNO1.01 km from centreHighland council
- WithdrawnCauseymire Wind Farm - The Proposed Development would comprise the full repowering of the existing Causeymire Wind Farm to include the removal of the existing 21 turbines (100 m tip height), and the construction of up to seven new wind turbines, each of up to a blade tip height of 200 m and associated ancillary infrastructure. The total installed capacity of the proposed turbines would be approximately 48 MW.Causeymire Wind Farm Halkirk KW12 6UPReceived 26 Apr 2026Decided 09 Jun 202626/01783/PAN3.29 km from centreHighland council
- WithdrawnFormation of a battery storage facility with a capacity of up to 19.8MW and associated infrastructureLand 600M NW Of Mybster Farm WattenReceived 29 Mar 2026Decided 08 Jun 2026Full26/01345/FUL1.21 km from centreHighland council
- ApprovedFormation of temporary accessLand 130M East Of RWE Bad A Cheo Wind Farm Office WattenReceived 25 Feb 2026Decided 14 Jul 2026Full26/00836/FUL3.08 km from centreHighland council
- ApprovedCauseymire Wind Farm Repowering - Replace the existing 21 turbines (in operation since 2004) with 13 wind turbines of 200m blade to tip height - Scoping RequestAchkeepster Wind Farm SpittalReceived 07 Nov 2025Decided 16 Jan 2026Outline25/04266/SCOP3.29 km from centreHighland council
Showing the 5 most recent of 5 within 5 km. Planning data from PlanIt, updated nightly. For older or narrowly defined applications, consult the council portal directly.