Planning · Torroy
Planning applications near Torroy
12 applications in the last 12 months within 5 km. Data aggregated from the local planning authority by planit.org.uk.
Last 30 days
0
Last 12 months
12
Pending
5
Approved
7
PendingApprovedRefusedWithdrawnOtherCentre of Torroy
- PendingConstruction of 300m Forest RoadLand 860M West Of Carbisdale Castle ArdgayReceived 01 Sept 2026Full26/03826/FUL2.97 km from centreHighland council
- ApprovedConstruction of forestry road (Class 22)Land 860M West Of Carbisdale Castle ArdgayReceived 06 Aug 2026Decided 02 Sept 2026Outline26/03393/PNO2.99 km from centreHighland council
- ApprovedErection of garageInverhouse Culrain Ardgay IV24 3DPReceived 19 Jul 2026Decided 07 Oct 2026Full26/03094/FUL2.43 km from centreHighland council
- ApprovedChange of use from quarry building to house (retrospective)Weighbridge Bothy Invershin Lairg IV27 4ETReceived 25 Feb 2026Decided 14 Apr 2026Full26/00828/FUL4.83 km from centreHighland council
- PendingInveroykel Wind Farm - Erection and Operation of a Wind Farm for a period of 40 years, comprising of 20 Wind Turbines with a maximum blade tip height 230m, battery energy storage system (BESS), access tracks, borrow pits, substation, control building, and ancillary infrastructure. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00005210Land 1.5KM South Of 2 Easter Kilmachalmack Strathkyle ArdgayReceived 10 Feb 202626/00601/S362.81 km from centreHighland council
- ApprovedEIA Scoping Request for the construction and operation of a new 132kV overhead line (OHL) connection between Shin Substation and a proposed cable sealing end (CSE) compound approximately 2 km west of Loch Buidhe Substation, and the dismantling of the existing 132kV OHL connection between Shin Substation and Loch Buidhe SubstationLand 2430M SW Of Loch Buidhe Bonar BridgeReceived 10 Feb 2026Decided 31 Mar 2026Outline26/00739/SCOP4.38 km from centreHighland council
- PendingErection of houseLand Adjacent To Railway Station Culrain ArdgayReceived 26 Jan 2026Outline26/00309/PIP4.19 km from centreHighland council
- PendingShin to Loch Buidhe 132 kV Overhead Line RebuildLand 2700M SE Of Haradwaith LairgReceived 08 Jan 202626/00076/PAN4.95 km from centreHighland council
- ApprovedErection of self-contained accommodationLand 50M West Of Kinvara Altass LairgReceived 19 Dec 2025Decided 17 Sept 2026Full25/04878/FUL3.88 km from centreHighland council
- PendingErection of house and formation of access (renewal of 22/04917/FUL)Land 160M North Of Springfield 48 Altass RosehallReceived 16 Dec 2025Full25/04815/FUL4.65 km from centreHighland council
- ApprovedErection of a house for holiday letting purposesLand 220M NW Of Carbisdale Castle ArdgayReceived 05 Nov 2025Decided 29 Sept 2026Full25/04198/FUL3.39 km from centreHighland council
- ApprovedFormation of temporary worker accommodation village comprising modular buildings, including living accommodation (c.150 beds), welfare and recreation uses, formation of access, parking and associated works.Land To The North Of Achinduich LairgReceived 31 Oct 2025Decided 20 Nov 2025Outline25/04180/SCRE4.97 km from centreHighland council
Showing the 12 most recent of 12 within 5 km. Planning data from PlanIt, updated nightly. For older or narrowly defined applications, consult the council portal directly.